Skip to main content
This page covers custom sync, which every tool uses except HubSpot and Salesforce. Standard sync for those two runs every 15 minutes on its own. See How Steerco syncs with your CRM.

Set a schedule

1

Open the schedule

On the connection’s page, click the Schedule tab.
2

Turn on auto-sync

Turn on Sync automatically.
3

Choose a frequency

Under Frequency, click Hourly, Daily, Weekly or Custom.
4

Choose the time

For Daily, set the Time. For Weekly, set the Day and Time. For Custom, choose an Interval from every 2 to every 12 hours.
5

Save

Click Save in the bar at the bottom of the page. The bar appears once you change something.
Times use your time zone. To stop scheduled syncs, turn off Sync automatically and save. The badge next to the tool’s name reads Auto-sync on or Auto-sync off for the saved schedule. Click the badge to open the Schedule tab. One Save commits your schedule and mapping changes together, from any tab. Your changes stay when you switch tabs. To discard them, click Cancel in the bar. Your workspace can also run every connection on one shared schedule. Then Sync automatically shows on, with a line such as “Runs daily at 06:00 UTC with every connection.” To give the connection a schedule of its own, click Set its own schedule.

Limit how far back a sync goes

On the Schedule tab, under Sync from, pick a start date, then click Save. Every sync, scheduled or manual, then pulls data from that date forward.

Run a sync yourself

On the connection’s page, click Sync now. It runs an incremental sync, which pulls only the records that changed since the last sync. The button reads Syncing… until the sync finishes, and you can’t start another one meanwhile. To pull every record again, run a full sync. Click the arrow next to Sync now, then click Full Sync. Run one after you change the mapping, or to repair missing data. When staging is on, the button reads Sync to staging, and the data goes to staging instead of production. See Check a sync in staging.

Check the last run

The status badge next to the tool’s name reads Connected until the first sync runs. After that, it shows the latest sync’s status, such as Completed or Failed. After a sync completes, the page shows Last synced and when it ran. To see every run, click the Jobs tab. It lists the latest 20 jobs, with each one’s Type, Sync type, Status, Started time, Duration and Records. To see a job’s details and any message, click its row. To stop a running job, click the stop button on its row, then click Stop job.

Next steps